Monday, 18 October 2010

Filming Schedule second week

Filming Scheduling: 18/10/10 - 21/10/10

Monday:

Filming must located at the cafe where Rosa and Tahir have an affair and the main character benjamin sees the two of them. Reaction shot of rosa, Performance of the character must be done.

Did Not Happen: Characters both failed to wear the costume they had to wear for the filming.

Tuesday

Filming must located at the cafe where Rosa and Tahir have an affair and the main character benjamin sees the two of them. Reaction shot of rosa, Performance of the character must be done.

Equipment need is camera, Tripod

Wednesday

Equipment need is camera, Tripod. Cinema scene must be done where benjamin walks barges into a different boy and sees him with his ex-girlfriend (Rosa).

Thursday

Equipment need is camera, Tripod

Friday

Equipment need is camera, Tripod


No comments:

Post a Comment